Selected Project References

Representative mandates across water and wastewater treatment infrastructure, engineering, project controls and digital delivery, including 2,000 MLD of water treatment capacity at Bhandup and two major wastewater treatment facilities in Mumbai.

Water treatment

Water treatment · Ongoing

Bhandup Water Treatment Plant

Location
Bhandup, Mumbai
Capacity
2,000 MLD
Status
Ongoing
Client
BMC
EPC
Welspun–Veolia JV
Project value
₹4,123 Cr
Contract term
4-year DB + 15-year O&M

Eau Labs scope

  • Review of basic and detailed engineering documents

Wastewater treatment

Wastewater treatment · Ongoing

Dharavi Wastewater Treatment Facility

Location
Dharavi, Mumbai
Capacity
418 MLD
Status
Ongoing
Client
BMC
EPC
Welspun–EDAC JV
Project value
₹4,140 Cr
Contract term
5-year DB + 15-year O&M

Eau Labs scope

  • Engineering review and procurement support
  • Civil/structural engineering, dashboard and 3D model

Wastewater treatment · Ongoing

Versova Wastewater Treatment Facility

Location
Versova, Mumbai
Capacity
180 MLD
Status
Ongoing
Client
BMC
EPC
DRN
Project value
₹1,658 Cr
Contract term
4-year DB + 15-year O&M

Eau Labs scope

  • Process, hydraulics and MEICA review
  • PMC, QA/safety audits and procurement tracking

Digital Twin & 5D BIM

Digital Twin & 5D BIM · Ongoing

Mumbai Coastal Road — North A & B

Location
Versova–Dahisar, Mumbai
Capacity
5D BIM
Status
Ongoing
Client
SYSTRA MVA
EPC
BMC (Principal)
Project value
₹5,402 Cr
Contract term
4.5-year DB + 10-year DLP

Eau Labs scope

  • 5D BIM and comprehensive digital twin
  • Dashboards, KPI/risk reporting and QA/QC compliance

Digital Twin & 5D BIM · Ongoing

Mumbai Coastal Road — North E & F

Location
Versova–Dahisar, Mumbai
Capacity
5D BIM
Status
Ongoing
Client
Nippon Koei
EPC
BMC (Principal)
Project value
₹5,373 Cr
Contract term
4.5-year DB + 10-year DLP

Eau Labs scope

  • 5D BIM and comprehensive digital twin
  • Dashboards, KPI/risk reporting and QA/QC compliance

Completed engineering

Completed engineering · Completed

Water & Wastewater Engineering, Ras Al Khaimah

Location
Ras Al Khaimah, UAE
Capacity
125 + 60 MLD
Status
Completed
Client
Kalpataru

Eau Labs scope

  • 125 MLD pumping station + 60 MLD water treatment facility
  • Pre-bid engineering, DBR, civil/structural design and BOQ
  • Process, hydraulics and MEICA support
  • Plant layout / GA drawings and design basis reports

Completed engineering · Completed

Water & Wastewater Engineering, Yanam

Location
Yanam, Puducherry
Capacity
6 MLD
Status
Completed

Eau Labs scope

  • 6 MLD water treatment facility
  • Pre-bid engineering, DBR, civil/structural design and BOQ
  • Process, hydraulics and MEICA support
  • Plant layout / GA drawings and design basis reports

Project values refer to the selected infrastructure projects, not Eau Labs fees. Status and scope follow the supplied project portfolio. DB: Design–Build. O&M: Operations & Maintenance. DLP: Defects Liability Period.

Request project credentials

Contact us for detailed credentials and references for your tender or evaluation.

Contact Eau Labs